For instance, the AIP being developed by the Navantia group of Spain will be ready only by 2025-26. Secondly, the inserting the ‘proven AIP’ clause could be seen as a premature decision when many nations are still developing the technology. Russia also pulled out of the Indian Navy’s tender terming it ‘unrealistic’. However, the stringent clause of proven AIP system forced the French and Spanish companies out of the race. Initially, TKMS from Germany, Navantia from Spain, Daewoo of South Korea, Rosoboronexport/Rubin Design Bureau from Russia and France’s Naval Group were in the race. Project-75 was initiated way back in November 2007 and ran into rough weather due to certain specifications demanded by the Indian Navy, which were not amenable to submarine manufacturers. Two of these were put together at MDL in 19 while the other two came from Germany. India had sourced four submarines from Howaldtswerke-Deutsche Werft (HDW) of Germany in the late 1980s. MDL will be responsible for constructing and delivering the submarines. (Photo: ANI)Īs per the “non-binding and non-financial” MoU, TKMS will contribute to engineering and design of the submarines as well as provide consultancy support. ![]() Defence Minister Rajnath Singh with his German counterpart Boris Pistorius.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |